237.6 KW self-consumption PV system for water pumping, replacing the diesel generator set with photovoltaic installation.
PROJECT DATA:
• Number of panels: 792
• Total power: 237.6 KWp
• Amortization years: 4 years
PV field of 237.6 kW in Almenar (Lleida) for application in direct solar pumping, using a NEPTUNO horizontal axis solar tracker. Power Electronic variator.
The park consists of 792 300 Wp polycrystalline photovoltaic modules.
The investment will be amortized over a period of approximately 4 years.