NEW TERMINAL ALICANTE AIRPORT (EL ALTET)

Portfolio Description
  • 0
  • 3 de August de 2020

PROJECT DATA:
Architect: Bruce S. Fairbanks – GOP
Owner: AENA

DOME
Construction of domes to cover processor buildings and boarding dock, using laminated and reinforced profiles, curved structural tube with painted finish.
Material: S-275 and 355 painted steel (4,500 Tons.)
STRUCTURE
Construction of a metal structure for boarding gateways in processor and dock, using laminated profiles and a structural tube with a painted finish.
Material: S-275 and 355 painted steel (1,300 Tons)
CANOPIES
Construction of a screwed metal structure for the formation of canopies on the covered floor of the parking building, using curved structural tube profiles with a galvanized and painted finish.
Material: Galvanized and painted steel S-275 and 355-JR (520 Tons.)


Abrir chat
Hola.
¿En que podemos ayudarte?